Mumbai Metro Line 5 | Thane Bhiwandi Kalyan Progress | March 2025 Update
Автор: Jaideep Kane
Загружено: 2025-03-10
Просмотров: 45259
Описание:
Metro Line 5 from Thane to Bhiwandi to Kalyan is 24.90 km. long elevated corridor with 15 stations.
It will provide interconnectivity among the ongoing Metro Line 4 (Wadala to Kasarvadavli) and the proposed Metro Line 12 (Kalyan to Taloja), and with the existing Central Railway.
It will provide rail based access to the commercial, Govt. bodies and geographical landmarks in Thane, Bhiwandi and Kalayan.
It will reduce the current travel time by anything between 50% and 75%
In This Video You Will See The March 2025 Progress Of Mumbai Metro Line 5
Connect me on-
Twitter- / jaideepkane
Instagram- / jaideepkaneyt
#mumbaimetro
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: