A Day in the Life of a Concrete Pump Operator | 31Z Dry Mud Battle + No Hose Guy Pour 🚫💪
Автор: We Work For a Living
Загружено: 2025-08-01
Просмотров: 1233
Описание:
Full setup to finish, dry mud challenge on the 31Z Schwing, tried forcing it through a 2" hose, pressure battles, no hose guy, poured straight from the reducer, boom precision on full display, flexing smooth controls, full water washback, hopper cleanout, drive to washout, real operator grind, no cuts, no edits, just raw boom work
🎥 Shot on GoPro HERO13
👷♂️ Operator POV | Rip Rap | Water Control
🔔 Like & subscribe for more day-in-the-life pumping from the deck.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: