How Boston's $24 Billion Tunnel Fell Apart
Автор: Billions Deep
Загружено: 2026-11-24
Просмотров: 0
Описание:
They promised to bury a highway for $2.8 billion. It cost $14.6 billion to build — $22 billion once the interest is paid. It killed a woman with glue. And Massachusetts is still paying for it, until 2038.
This is the story of the Big Dig: the most expensive highway project in American history, the six-billion-dollar lie that hid its true cost, and the ceiling panel held up by epoxy that fell on a driver on her way to the airport.
CHAPTERS
00:00 The promise
00:16 The highway that cut a city in half
01:30 The veto and the cap
02:17 The cover-up
04:58 The ceiling
06:24 The reckoning
07:22 Was it worth it?
THE NUMBERS
$2.8bn promised (1982) → $14.6bn to build → $22bn with interest, paid off 2038.
Count the transit projects built to soften the blow and the bill reaches $24.3bn.
Federal contributions were capped at $8.55bn (2000); Massachusetts borrowed the rest.
26 tons of ceiling fell on 10 July 2006, killing Milena Del Valle, 38.
Settlement 23 Jan 2008: $458.2m (Bechtel $352m, Parsons Brinckerhoff ~$50m,
owner-controlled insurance $40m, design consultants $11.1m). Total recoveries $610.6m.
SOURCES
NTSB Highway Accident Report HAR-07/02, Ceiling Collapse in the Interstate 90
Connector Tunnel, Boston, Massachusetts, July 10, 2006
(ntsb.gov/investigations/AccidentReports/Reports/HAR0702.pdf) — diagrams in this
video are simplified rebuilds of NTSB Figs. 7 and 15; report figures are public domain.
Massachusetts Inspector General, A History of Central Artery/Tunnel Project Finances,
1994–2001 (Robert Cerasoli, March 2001)
Mass.gov: $458.2 Million Central Artery/Tunnel Settlement (23 Jan 2008);
Attorney General's Office Big Dig recoveries ($610.6m)
Federal Highway Administration / Massachusetts Turnpike Authority project records
(costs, federal cap $8.55bn, debt retirement 2038)
MUSIC
"Night of Chaos" Kevin MacLeod (incompetech.com)
Licensed under Creative Commons: By Attribution 4.0 License
http://creativecommons.org/licenses/by/4.0/
VIDEO CLIPS
Boston Harbor footage: FASTILY, CC BY-SA 4.0, via Wikimedia Commons
(Boston Harbor 1 & 2, 2019-12-11)
Cement mixer truck, aerial (generic construction B-roll, not the Big Dig):
"Aerial View of Cement Mixer Truck at Construction Site", K, Pexels
https://www.pexels.com/video/aerial-view-o...
Construction site with concrete pouring, aerial (generic construction
B-roll, not the Big Dig): "Aerial View of Construction Site with
Machinery", TR Studio, Pexels
https://www.pexels.com/video/aerial-view-o...
The two generic Pexels clips are illustrative B-roll only and are never presented
as footage of the Big Dig itself.
PHOTO CREDITS (Wikimedia Commons — condensed to fit YouTube's 5,000-character description limit; full photo titles are in the video credits)
Edward Orde CC BY-SA 4.0; Eric Kilby CC BY-SA 2.0; Benoît Prieur CC0; Stephen Warner, Carol M. Highsmith, Ernst Halberstadt, National Transportation Safety Board, Metropolitan Highway System, Architect of the Capitol / O.J., White House Photographic Office — Public domain; Unknown authors — Public domain / CC BY 2.0; Boston City Archives CC BY 2.0; Cambridge Historical Commission CC BY 2.0; ArnoldReinhold CC BY-SA 3.0 / 4.0; MrJARichard CC BY 4.0; Secretary of the commonwealth CC BY-SA 4.0; Matthias Nonnenmacher CC BY-SA 4.0; Michael Gredenberg CC BY-SA 3.0; Christian David CC BY-SA 4.0; King of Hearts CC BY-SA 4.0; Ajs CC BY-SA 3.0; ktr101 CC BY-SA 4.0; Garrett A. Wollman CC BY-SA 2.5 (used by permission); Pi.1415926535 CC BY-SA 4.0 / 3.0; Ian Howard CC BY-SA 3.0; Daniel Lobo CC BY 2.0; Bostonnow CC BY-SA 4.0; formulanone CC BY-SA 2.0; Mr. Matté CC BY-SA 4.0; MKdeJong CC BY-SA 3.0; Greenway Conservancy CC BY-SA 4.0; Hellogreenway CC BY-SA 3.0; NewtonCourt CC BY-SA 4.0; Sarah Nichols CC BY-SA 2.0; Bert Kaufmann CC BY 2.0; Ethan Long CC BY-SA 2.0; Robbie Shade CC BY 2.0; Niranjan Arminius CC BY-SA 4.0.
DIAGRAMS (built for this video, orange/charcoal series)
Cost ladder ($2.8bn → $14.6bn → $22bn → $24.3bn), federal cap chart, epoxy-creep
mechanism and creep curve (simplified from NTSB HAR-07/02 Figs. 7 + 15), $458.2m
settlement breakdown. The pre-Big Dig highway map frame is from the Wikimedia Commons
file Boston Highway System Pre Post Big Dig.gif (MrJARichard, CC BY 4.0).
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: