ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

CPX-AP-I-EC EtherCAT Remote I/O with OMRON PLC | 3/3 Commissioning

festo

ethercat

cpx-ap-i-ec

omron

remote i/o

plc

commissioning

commission

application note

controller

manual

instruction

tutorial

service2see

video

festo service

video tutorial

how to

support

technical support

Автор: Festo Service

Загружено: 2025-10-15

Просмотров: 20

Описание: The Festo tutorial is about commissioning the CPX-AP-I-EC Remote I/O with a OMRON PLC. The third video shows you how to do the commissioning using Omron Sysmac Studio.

---
Chapters:
00:00 Title, Parts list, cables and products
00:31 Creating a new project
01:11 Configuring the IP address of the PLC
02:46 Adding the ESI file
03:42 Configuring CPX-AP devices
08:16 Adding the library
09:05 Process data input monitor and output control
11:05 Diagnostics of CPX-AP

---
Application Note about this topic:
Festo CPX-AP-.-EC with Omron Sysmac PLC through EtherCAT
Specific product/article list | Festo IN

---
Products shown in the video:
Omron PLC Omron NJ301-1100 V1.18
8086609 EtherCAT head module CPX-AP-I-EC-M12 Rev 01
8086604 IO-Link master CPX-AP-I-4IOL-M12 Rev 01
8101539 Electric cylinder unit EPCE-TB-45-10-SL-ST-M-H1-PLK-AA Rev 01

---
Questions or feedback?
Contact us.
https://www.festo.com/contact

---
Festo website:
Visit us.
https://www.festo.com

---
Festo Service:
The channel for everything to do with service and support. Quickly and easily commission, configure, operate and repair Festo products. The tutorials from Festo Service will help you!

---
Safety instructions:
Before, during and after the work, all guidelines, rules and regulations applicable in your own country must always be observed. Installation (including software), in particular for demonstration purposes, repair and commissioning must only be carried out by qualified, trained and instructed specialist personnel and in accordance with the operating instructions for the products. All installations, maintenance and repair work must only be carried out when switched off. All energy supplies must be permanently interrupted. During the work, some protective equipment might be put out of service. These must be properly reinstalled immediately after completion of the work, put into operation and checked for function! It is imperative that safety instructions and the instructions for handling the product are fully read, understood and adhered to during the work before starting work! When working on the products, the applicable regulations regarding occupational health and safety technology as well as all specifications of the operating instructions and, if applicable, written repair instructions must be observed. If you have any questions or uncertainties, please contact Festo SE & Co. KG directly and do not continue the work until clarification.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
CPX-AP-I-EC EtherCAT Remote I/O with OMRON PLC | 3/3 Commissioning

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]