Finishing the 300lb Minecart Forge Stand (Part 2)
Автор: South Texas Blacksmith
Загружено: 2026-03-07
Просмотров: 80
Описание:
Part two of the forge stand build. We are finishing up the 2 3/8-inch pipe legs and capping the top with that massive 3-inch by 1/2-inch angle iron. The kids helped drive this one across the finish line.
We overbuilt it because a 4-burner forge needs a rock-solid foundation, not some wobbly thin-wall garbage. It’s heavy, it's over-engineered, and it will outlast the shop. Next stop is firing the burners.
Check out the blades we forge on this setup:
southtexasblacksmith.etsy.com
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: