Complete Bakery Production Line - Flat Breads
Автор: RabinWorldwide
Загружено: 2019-03-13
Просмотров: 18503
Описание:
*AVAILABLE FOR IMMEDIATE SALE*
2019
rabin.com
Complete Bakery Production Line
for Sandwich Thins, Flat Breads & Wraps
Surplus to the needs of Major UK Baking Company
For immediate sale:
Inspection is available by appointment
For more information, please contact:
Eran Ben-Avi - [email protected]
+1.215.313.3224 or +1.415.248.2021
Equipment Location:
Western Distribution Park, Govier Way
Severn Beach, Bistol BS35 4GG, UK
New installation in 2011 featuring:
Sancassiano dough mixing system designed to handle 2800 kg of dough per hour with (2) Genesi double force mixers with scrap dough return
Fritsch 1300mm sheeting and cutting line with throughput of approx. 30,000 units per hour, consisting of primary dough extruder and multiple laminator stations with rotating cutters
Air-conditioned belt type prover system with temperature parameters of 25-40 degree C, with humidity range of 40-65%. Full enclosure included.
Den Boer infra-red heated Multibake high temperature oven with 1.3-meter wide belt, plus oven loading and unloading mesh belt systems
Koma cooling tunnel with HMI recipe selection for sandwich thins, bagel thins, wraps and sandwich pita with product cooling range of 8.5 to 20 minutes
UBE model 09SSW single band slicer for sandwich thins (assembled directly after cooling tunnel with wide belt down belts to product stackers
(2) Schubert robotic product stackers with stacking capability of either 4,5,6 or 7 units depending upon recipe selection
(2) Ilapak Delta 4000 right & left-hand flow wrappers designed for 100 zip packs per minute, with Markem Smart date coders and Mettler Toledo metal detectors
mportant Information:
The entire production line including all flour support systems, product conveyor, electrical switchgear and plc systems has been decommissioned, professionally disassembled and stored offsite at a Warburtons' warehouse facility.
A sister line to the above which is nearly identical to the above is currently in operation at a major Bristol manufacturing plant. The cost to disassemble and transport was approximately 500,000 British Pounds Sterling, representing an enormous saving to the future end user.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: