Young Achievers School | Mattapan, MA
Автор: Lockheed Window Corporation
Загружено: 2020-04-13
Просмотров: 698
Описание:
OWNER
Boston Public Schools | Boston, MA
ARCHITECT
Dietz & Co. | Springfield, MA
GENERAL CONTRACTOR
Lockheed | Pascoag, RI
LOCKHEED PROJECT MANAGER
John Kroll
This project consisted of removing existing double hung windows and replacing them with EFCO 450G and HX 45 windows. All windows were provided in a 2 coat 70% Kynar paint finish, with a color of Antique White. All windows were also provided with 1” thick insulated glass containing a ½” air space with argon gas and PPG Solarban 70XL Low E coating for optimum energy performance. All window openings received new interior wood surrounds and window treatment. This project also consisted of Lockheed removing and replacing hollow metals doors and frames and new electrical access control hardware. The challenging part of this project was the timing, as all work associated with classrooms needed to be completed during the summer recess.
INSTALLED COMPONENTS INCLUDED:
293 EFCO 450G Project-In / Fixed (Simulated Double Hung) Windows
44 EFCO HX 45 Double Hung Windows
10 Large Openings with Radius Top Framing
17 Hollow Metal Doors and Frames
New Electrical Access Control Hardware
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: