ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

IHC Hydrohammer: S-500W FPSO Mooring Pile Installation

Автор: HydrohammerChannel

Загружено: 2013-05-02

Просмотров: 32775

Описание: IHC Hydrohammer: S-500W FPSO Mooring Pile Installation

The IHC Waterhammer® was developed by IHC Hydrohammer® for use in ultra deep water. It is controlled by a radical hydraulic system that uses sea water instead of oil. This addresses the practical issue of it being technically very hard to pump oil to and from such depths, while of course there is no shortage of sea water around the structure. There are also environmental benefits in that this solution removes the risk of accidental oil leaks.

Over the next few decades, the IHC Waterhammer® will add a complete new dimension to technology and safety in the field of underwater pile driving.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
IHC Hydrohammer: S-500W FPSO Mooring Pile Installation

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

IHC Hydrohammer: The IHC Waterhammer®

IHC Hydrohammer: The IHC Waterhammer®

Single Suction Pile Installation Methodology

Single Suction Pile Installation Methodology

Introducing EQ-Piling

Introducing EQ-Piling

DNT, Spun pile installation, piling offshore by Diezel hammer and crane ponton

DNT, Spun pile installation, piling offshore by Diezel hammer and crane ponton

FPSO Towing and Mooring Installation

FPSO Towing and Mooring Installation

Installation procedures of Mooring buoy for BDPOC

Installation procedures of Mooring buoy for BDPOC

Acteon | SEPLA (Suction Embedded Plate Anchor)

Acteon | SEPLA (Suction Embedded Plate Anchor)

INSTALLING FLOATING WIND - EPISODE 4: HOOK-UP OPERATION

INSTALLING FLOATING WIND - EPISODE 4: HOOK-UP OPERATION

Riser Installation

Riser Installation

Dawson - Hammering underwater - HPH9000 hammer in subsea Low quality

Dawson - Hammering underwater - HPH9000 hammer in subsea Low quality

Subsea Drilled Anchor Pile

Subsea Drilled Anchor Pile

OCEANEERING ROV SUCTION PILE INSTALLATION PUMP

OCEANEERING ROV SUCTION PILE INSTALLATION PUMP

How does it work: Stevtensioning

How does it work: Stevtensioning

ICOP SpA - Piling offshore Trieste

ICOP SpA - Piling offshore Trieste

Offshore Air Diving in the Gulf of Thailand

Offshore Air Diving in the Gulf of Thailand

FSO FPSO BRIDON MOORING HAWSER CHANGE OUT

FSO FPSO BRIDON MOORING HAWSER CHANGE OUT

StabFrame animation for subsea pile driving

StabFrame animation for subsea pile driving

OFFSHORE PLATFORM JACKET INSTALLATION

OFFSHORE PLATFORM JACKET INSTALLATION

单桩基础海上风电施工工艺简介

单桩基础海上风电施工工艺简介

subsea drilling and wellhead instllation

subsea drilling and wellhead instllation

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]