Raubex _ Beitbridge Border Post Modernisation Project _ Reservoir Construction and Roof Floating
Автор: Raubex Group Limited
Загружено: 2022-06-23
Просмотров: 8695
Описание:
Part of the Beitbridge Border Post Modernisation Project was the construction of a 11.4 mega liter reservoir to supply water to the border post and surrounding area. This video illustrates the construction of the reservoir, including the very impressive final stage of floating the 1 500 ton reservoir roof up using water and then rotating it by hand to lock into place. Another example of the world class infrastructure construction capabilities of the Raubex Group.
www.raubex.com
www.empa.co.za
www.omv.co.za
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: