ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

FPSO Petrojarl Knarr - Sailaway from Samsung Korea

Автор: Offshore, Maritime and Energy

Загружено: 2024-10-26

Просмотров: 409

Описание: Project Brief: Petrojarl Knarr FPSO

Overview: The Petrojarl Knarr is a Floating Production, Storage, and Offloading (FPSO) vessel operating in the North Sea, specifically on the Knarr oil and gas field, which is located off the coast of Norway. It plays a critical role in the extraction, processing, and storage of hydrocarbons in this offshore field, one of the key developments in the region.

Towing Operations
Three tugs of Fairmount Marine have towed the new floating production, storage and offloading (FPSO) vessel Petrojarl Knarr from South Korea to Norway in just 61 days. Petrojarl Knarr, one of world’s largest FPSOs for harsh environments, was delivered to the port of Haugesund, Norway, 16 September 2014.

The entire voyage was under command of lead tug master Kees de Graaff on board of the leading tug Fairmount Sherpa. The Petrojarl Knarr is 256.4m-long and 48m-wide with a deadwweight tonnage ot 135,000-ton. The vessel is owned by Teekay Corporation and was built by Samsung Heavy Industries in Geoje, South Korea. Petrojarl Knarr will be deployed in the Knarr oil and gas field offshore Norway.

On its way to Norway, the convoy has made stops in Singapore, Port Louis (Mauritius), and Las Palmas (Canary Islands) to take bunkers and for replenishments. For the last leg of the voyage, the convoy sailed west of Ireland via Fair Isle (just south of the Shetland Isles) towards Norway. Offshore the port of Haugesund, the Petrojarl Knarr was delivered ahead of schedule.

Facility Data
Owner: Teekay Petrojarl
Builder : Samsung
Type: FPSO
IMO: 9630987
Year: 2014
Call Sign: C6AP8
Length OA: 256 m
Beam: 48 m
Water depth: 410 m
Draught: 18.621 m
Gross Tonnage: 95,418 t
Net Tonnage: 35,827 t
Deadweight: 125,135 t
Gas handling: 47 mmscfd
Toatal liquids: 110,000 bpd
Riser Slots: 15
Mooring type: Turret mooring
Produced water: 84,000 twpd
Water injection: 95,000 bwpd
Production capacity of 63,000 bbls
Storage capacity : 800,000 barrels
Accommodation : 100 people.

Operator and Field Information:
Operator: Equinor (formerly Statoil)
Field: Knarr oil and gas field, located in the North Sea, around 120 km offshore from Norway in water depths of approximately 400 meters.
Ownership: Owned and operated by Altera Infrastructure, the vessel was built to service this field under a long-term charter.

Operations and Milestones: The Petrojarl Knarr was deployed to the Knarr field in 2015. Its development was key to tapping into the Knarr field, which was discovered in 2008. The field contains both oil and gas reserves and is known for challenging operating conditions, including harsh weather and rough seas, making the FPSO’s ability to handle difficult environments crucial.

-----------------------------------------

If you would like to share further info on this facility, please leave a comment and we will update soonest.

Offshore, Maritime and Energy Industry Channel : All data, video and copyright belong to respective owners.

No Endorsement: Any references, links, or mentions of third-party products, services, or websites in this video are for informational purposes only. Such references do not constitute an endorsement or recommendation by the content creator.
Third-Party Content: This video may include content from third parties, such as images, videos, music, or other media. The use of such content is either done under the principles of fair use, with appropriate permissions, or falls within the realm of public domain. If you believe that any content used in this video infringes upon your intellectual property rights, please contact us so that we can address the issue promptly.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
FPSO Petrojarl Knarr - Sailaway from Samsung Korea

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Sanktuarium Matki Bożej Licheńskiej – transmisja na żywo

Sanktuarium Matki Bożej Licheńskiej – transmisja na żywo

FPSO Petrojarl Knarr Sailaway - Teekay's Largest Project [HD]

FPSO Petrojarl Knarr Sailaway - Teekay's Largest Project [HD]

The Rapid Rise of Korean Shipbuilding

The Rapid Rise of Korean Shipbuilding

Yinson Production: FPSO Abigail-Joseph Virtual Tour

Yinson Production: FPSO Abigail-Joseph Virtual Tour

IMPOSSIBLE Restoration — Abandoned Oil Rig Crane 50 Years Storm Zone to High Tech

IMPOSSIBLE Restoration — Abandoned Oil Rig Crane 50 Years Storm Zone to High Tech

Petrojarl Knarr Sailaway: November 2014

Petrojarl Knarr Sailaway: November 2014

REASSENTAMENTO - Parte 1

REASSENTAMENTO - Parte 1

China Completes Main Structure of Self-Designed Cylindrical FPSO Unit

China Completes Main Structure of Self-Designed Cylindrical FPSO Unit

FPSO Petrojarl Knarr - Aerial Flyby During sailaway

FPSO Petrojarl Knarr - Aerial Flyby During sailaway

Floating Blue Ammonia FPSO Video

Floating Blue Ammonia FPSO Video

APL Submerged Turret Production

APL Submerged Turret Production

ABB Process Power Simulator for Floating Production Storage and Offloading (FPSO) units

ABB Process Power Simulator for Floating Production Storage and Offloading (FPSO) units

Yinson Production: FPSO Agogo Project Update - Successful Completion of Module Lifting Campaign

Yinson Production: FPSO Agogo Project Update - Successful Completion of Module Lifting Campaign

Yinson Production: FPSO Atlanta Project Completion

Yinson Production: FPSO Atlanta Project Completion

Hunting $320,000 Giant Blue Crabs on an Ancient Rusty Ship

Hunting $320,000 Giant Blue Crabs on an Ancient Rusty Ship

32,000-tonne FPSO vessel delivered in E China's Qingdao

32,000-tonne FPSO vessel delivered in E China's Qingdao

Accelerate the Evolution of Your FPSO Design, Build, and Operations

Accelerate the Evolution of Your FPSO Design, Build, and Operations

Projecto Mozambique LNG - Geração de biodiesel

Projecto Mozambique LNG - Geração de biodiesel

FPSO Sea Rose departing Belfast Harbour - October 22nd 2024

FPSO Sea Rose departing Belfast Harbour - October 22nd 2024

FPSO Petrojarl Knarr

FPSO Petrojarl Knarr

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]