What you need to know about Hanging sheetrock. Should I Do My Own Drywall?
The ceilings go up first, Be sure to see your local codes for the required thickness of sheetrock that goes onto the ceiling. For the walls, Start with full sheets of drywall from top to bottom, and attach them horizontally. Keep in mind, Before putting up the sheetrock, you will need to make sure your studs are shimmed and straightened as needed. Also, depending on the area you live in, you may need to pass a sheetrock nailing inspection.
A Professional team of drywallers can take from 1-2 days to hang the sheetrock and another 4-6 days to tape, mud, and sand a three-bedroom house.
They can do this quickly and they can do it right because they have the experience with the tools of the trade, Chances are that They can finish an entire house within the time it would take you to finish one room. Remember, when building time is of the essence.
So ask yourself, how can you get the most value out of your time? By doing it yourself, or by hiring a team of skilled professionals.
Tools and equipment you will need for the job
Finishing mud knives in 6” 8” and 12”
A Mud pan, drill, and mixing paddle, drywall sanding tools, and something to reach those high places. A rolling scaffold or drywall stilts, whichever works for you.
Tape, coat, and sand the joints of your sheetrock to keep the room at a steady temperature to prevent cracking as the drywall mud dries. The finish options for your walls can be a variation texture, flat, or imperfect smooth. We went with Light imperfect smooth.
Thank you for watching SHEMSS, To build your very own custom home, Go to shemss.com
FOLLOW US ON: