Let us see what is the step by step procedure of Load Change ,Tariff Change and Meter Shifting in KSEB . An application regarding a service connection e.g. revising connected load, phase conversion, tariff change, billing disputes etc. will normally be processed only if the registered consumer is the applicant.Also , ensure thatall the electrical installations are done by a licensed Electrical Contractor.
Meter Shifting ,Tariff Change and Load Change
If you are re-build your house or complex(for Construction Purpose)you have to apply for these three.Also after the completion of works you need to do the procedures once again.
At first you must make the arrangements to shift the meter to a safe place with the help of a licensed contractor .In this regard, proper Earthing and Protection of Metering Equipment and other Saftety measures like E.L.C.B/R.C.C.B are very essential.
L and T യുടെ ELCB വാങ്ങാൻ
https://amzn.to/2TVTcG5
For the Tariff change ,the consumer premises must the requirements of proposed Tariff.
The load calculation should match with the existing installations.Incorrect load may lead to penal bills later.
Application Forms
1.For Load Change.
http://www.kseb.in/index.php?option=c...
2.For Tariff Change and Meter Shifting.
http://www.kseb.in/index.php?option=c...
Supporting Documets
1.Identity Proof
2.Test Report/Completion Certificate.
3.Sketch of Installation.
After submitting the Application ,your details are verified by a field staff.
Fees and ACD(Including GST(18%) and Flood Cess(1%))
1.Application Fee-Rs.58/-
2.Meter Shifting Fee-Rs.726/-(Single Phase)
3.ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other)
The Forms can be used for single purposes and Consumer can fill the application based on their needs.The difference in fees is as follows.
Ø Tariff Change and Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).
Ø Meter Shifting
1.Application Fee-Rs.41/-
2.Meter Shifting Fee-Rs.726/-
Ø Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).
Ø Tariff Change
1.Application Fee-Rs.41/-
Some Common Tariff and Purposes.
LT-1A-Domestic
LT-4A-Industrial/Drinking Water Projects.
LT-7A-Commercial
LT-7B-Commercial(Small Shop/Bunk)
LT-6F-Construction/Mobile Towers/Un-aided Schools
LT-6A-Mosque/Temple/Church.
LT-6D-Govt, Aided School.
LT-6G-Medical Lab
LT-5B-Farms
LT-5A-Agriculture
LT-6C-Bank
LT-10- Electric Charging Stations(New)
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: