Zetwerk Case Study 004: Fabrication | Doing The Impossible
Автор: ZETWERK
Загружено: 2021-08-05
Просмотров: 1624
Описание:
Exceeding expectations is the Zetwerk way. For the prestigious Coastal Road Project in Maharashtra, Zetwerk was tasked with manufacturing and supplying structures – all within 10 days.
"In an industry context where people are constantly over-committing and under-delivering, we believe in doing the exact opposite. At Zetwerk, we take our commitments very seriously and love walking the talk", said Srinath Ramakkrushnan, COO, on the achievement.
Watch the latest case study of how Zetwerk pulled off the impossible and delivered a vital part of the project ahead of schedule.
#Fabrication #Infrastructure #Manufacturing #Technology #MakerMindset #MaximizeManufacturing #TeamZetwerk
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: