Primavera P6 MEP Scheduling – Logic-Driven WBS Step by Step (No Dates, No Constraints) |
Автор: MrALRamadhan
Загружено: 2025-12-18
Просмотров: 10
Описание:
🔧 What this video REALLY teaches (Not theory)
If your P6 schedule looks “good” but still finishes late — this video explains why.
Dates don’t control projects. Logic does.
In this practical guide, you will see how real MEP projects must be structured in Primavera P6, starting from a clean WBS and ending with a claims-defensible, logic-ready schedule.
🧠 What you will learn – عمليًا
• How to build an MEP WBS that reflects real site execution, not software defaults
• Why adding dates early destroys schedule integrity
• Correct separation of:
• Engineering
• Procurement
• Installation
• Testing & Commissioning
• How to split Installation by discipline (HVAC, Electrical, Plumbing, Fire)
• Why Testing & Commissioning must be visible — not hidden
• The golden rule: If logic is wrong, dates are lies
• كيف تبني WBS احترافي في Primavera P6 يعكس الواقع التنفيذي بالموقع
• لماذا إدخال التواريخ مبكرًا يسبب تأخير وهمي وخسارة المطالبات
• الفصل الصحيح بين:
• الهندسة
• التوريد
• التنفيذ
• الاختبارات والتشغيل
• تنظيم أنشطة MEP حسب التخصص وليس كحزمة واحدة
• إظهار T&C كنقطة حاسمة للإنهاء وليس نشاط شكلي
• القاعدة الذهبية: إذا كان المنطق خطأ، فالجدول كله كذب
🛑 Common Mistakes this video fixes
• One MEP activity for everything
• Hidden approvals with no duration
• Commissioning as a single activity
• Start/Finish milestones used incorrectly
• تجميع كل أعمال MEP في نشاط واحد
• تجاهل أنشطة الاعتماد والموافقات
• اعتبار التشغيل نشاطًا واحدًا فقط
• استخدام Milestones بطريقة خاطئة
🎥 Why you should watch the previous video first
This video is Part 2.
The previous video explains:
• Why most schedules fail
• How planners misuse Primavera P6
• The difference between a “calendar schedule” and a control schedule
▶️ Watch Part 1 first to avoid building logic on a broken foundation.
🚀 Call to Action
🔗 Related Practical Videos (Step-by-Step Series)
▶️ 1. MEP Schedule Logic Fundamentals in Primavera P6
(Build correct predecessors, successors & real construction logic)
🔗 • MEP Scheduling in Primavera P6 | Practical...
▶️ 2. Detecting Open Ends & Hidden Schedule Errors (P6 Forensic Check)
(Why approved schedules still fail on site)
🔗 • Primavera P6 MEP Scheduling – Logic-Driven...
▶️ 3. Critical Path vs Longest Path Explained (MEP Reality)
(Stop trusting fake critical paths)
🔗 • Primavera P6 Civil–MEP Interface Control |...
▶️ 4. How Constraints Manipulate Primavera P6 Schedules
(Finish On, Mandatory Start & how delays are hidden)
🔗 • Primavera P6 Procurement Scheduling | Long...
▶️ 5. Modeling Testing & Commissioning Correctly in P6
(The real driver of MEP project completion)
🔗 • Primavera P6 MEP Scheduling Commissioning,...
▶️ 6. Authority Inspections & Re-Inspection Logic in Primavera P6
(Build a defensible schedule for consultants & claims)
🔗 • Final MEP Schedule Outcome in Primavera P6...
• Subscribe for real site-driven planning
• Share this video with your planning team
• Comment “MEP LOGIC” if you want the next video on sequencing & relationships
إذا كنت مهندس MEP أو مخطط مشاريع:
• اشترك بالقناة لمحتوى تخطيطي عملي من أرض الموقع
• شارك الفيديو مع فريق التخطيط
• اكتب “MEP LOGIC” بالتعليقات لشرح العلاقات والروابط المنطقية في الفيديو القادم
#PrimaveraP6
#MEP_Scheduling
#ProjectPlanning
#ConstructionPlanning
#MEP_Engineering
#DelayAnalysis
#ClaimsManagement
#جدولة_المشاريع
#Primavera_بالعربي
#MEP_احترافي