Large Retaining Wall Construction - Timelapse
Автор: Dirt Ninja
Загружено: 2016-10-24
Просмотров: 92742
Описание:
On this 800Sq/Ft engineered retaining wall project in Haverhill Massachusetts, Anchor Diamond Pro wall block, purchased from Genest Concrete was selected. A no fines concrete mix of 7:1, 3/4" stone to cement, was installed as the infill material to allow for wall stabilization and 100% drainage permeability. The mix was supplied by Kingston RedTMix of Methuen Massachusetts. After installing the Torpedo block base row, and 1 row of wall block by hand, the remaining 700Sq/Ft of wall block was installed by 4 employees using the PaveTool Quick-e-Clamp in less than 8 hours with no employee ever lifting a block. About 40,000 photos make up this timelapse.
Like what you see? Check out The Dirt Ninja on Facebook here: / thedirtninja Follow me on Instagram / the_dirt_ninja Be sure to hit the subscribe button to see new videos every week!
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: