Views of Lock 7 drained, and 'Stop Log' safety barrier installed, Welland Canal (2019)
Автор: RightInNiagara
Загружено: 2019-02-08
Просмотров: 9557
Описание:
Several views of the work underway at Lock 7 of the Welland Canal, the last scene being from today, Feb.8, 2019.
The canal was closed for its winter season at the end of Dec.2018 and on Jan.2, 2019, a temporary dam, made of stackable steel beam sections called 'stop logs', was installed above Lock 7, so that the lock could be safely drained for maintenance work to proceed. Today (Feb.8, 2019) they were doing some welding on one of the lock's mitre gates. Today's temp was -3C.