LIRR PARK Interlocking Signal 1-2E Aspects - Reduced Aspect Signal
Автор: Northeast Trainman
Загружено: 2025-11-25
Просмотров: 132
Описание:
Back on a sunny (and HOT) summer day in 2025, I took a trip to Floral Park on the Long Island Rail Road. One of my goals was to observe the signal indications. In this video, we take a look specifically at the PARK 1-2E Signal at PARK Interlocking, a Reduced Aspect Signal. This particular signal and switch was installed as part of the LIRR Third Track project.
What stood out to me about this signal, was that I never saw anything like this before. It reminded me slightly of some I see on SEPTA's Regional Rail, but nothing exactly like it. Plus with the switch being there, I took a few clips of the signals changing and the switch track aligning / re-aligning.
For more information on LIRR's Reduced Aspect Signals, read Jersey Mike's (@PositionLight) Blog: https://position-light.blogspot.com/2...
Enjoy the sights & sounds.
0:00 - Stop to Proceed
0:27 - Eastbound LIRR Train Takes Proceed Signal
0:57 - Signal Drops to Stop
1:27 - Signal Changes to Stop & Proceed
1:40 - Signal Changes to Proceed
1:56 - Eastbound Hempstead Train Takes Proceed Signal
3:47 - Track Switches & The Signal Changes from Stop to Proceed
#LongIslandRailRoad #LIRR #RailroadSignals
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: