Episode 295 with Bryan Haywood focuses on how to manage complex lockout/tagout (LOTO)—the kind of hazardous‑energy control work that goes far beyond a simple disconnect. The episode highlights why complex LOTO requires deeper planning, stronger coordination, and more rigorous verification than standard procedures.
What Makes a Lockout “Complex”
Complex LOTO applies when equipment has multiple energy sources, multiple isolation points, or multiple crews involved. These situations often include:
Process vessels and reactors
Systems with electrical, mechanical, hydraulic, pneumatic, chemical, or thermal energy
Equipment requiring double block and bleed
Tasks that span multiple shifts or require sequencing
Scenarios where a single disconnect cannot isolate all hazards
NFPA 70E defines complex LOTO as any situation with multiple energy sources, multiple crews, multiple crafts, multiple locations, or multiple disconnecting means—requiring a written plan and a designated person in charge.
Key Concepts from the Episode
1. Understanding the Hazardous Energy Profile
Haywood explains that complex LOTO begins with mapping every form of hazardous energy in the system. For process equipment like reactors and vessels, this includes:
Internal pressure
Residual chemicals
Steam or thermal energy
Stored mechanical energy
Multiple electrical feeds
The goal is to identify all energy sources and how they interact.
2. Double Block and Bleed
A major focus of the episode is the use of double block and bleed to isolate hazardous energy in process systems. This method:
Uses two closed valves with a bleed valve between them
Ensures isolation even if one valve leaks
Is essential for chemical, steam, and pressure systems
Haywood emphasizes that operators must be trained to understand when and how to apply this method.
3. Verification of Zero Energy State
Verification is more complex than simply “trying the start button.” Haywood discusses multiple verification methods:
Attempting to restart equipment
Checking pressure gauges
Confirming depressurization of air and water systems
Ensuring valves are locked, tagged, and in the correct position
Verification must be documented and repeatable, especially when multiple crews are involved.
4. Written LOTO Plans
Because complex LOTO involves many moving parts, a written plan is mandatory. The plan must include:
All energy sources and isolation points
Step‑by‑step isolation instructions
Roles and responsibilities
Verification steps
Shift‑change procedures
Group lockout methods (lockbox, operation lock, etc.)
NFPA 70E requires a designated person in charge who oversees the entire process.
5. Training and Coordination
Haywood stresses that operators and maintenance teams must be trained to:
Recognize complex energy interactions
Follow written LOTO plans
Communicate across shifts and crafts
Use group lockout devices correctly
Coordination failures are one of the biggest risks in complex LOTO.
Leadership Takeaways
Strong safety leaders ensure:
Complex LOTO is treated as a project, not a task
Written plans are used every time
Verification is thorough and multi‑step
Operators are trained in double block and bleed
A single person is accountable for the entire lockout
Communication across crews and shifts is structured and documented
Complex LOTO is where systems thinking matters most—because the consequences of missing a single energy source can be catastrophic.