#Howwedoit
Автор: Sarens
Загружено: 2023-07-31
Просмотров: 5282
Описание: Sarens is currently undertaking a project of iconic significance for the modernisation of the national rail network in France. As part of the project, first the two century-old rail bridges weighing 468T each – the Pont de Chartres for RER line B and Pont de Gallardon for RER line C – will be dismantled. Sarens worked on the first phase of the project involving the dismantling of the two old bridges this past July 2023. The SGC-90 lifted the two bridge sections and set them down on SPMTs. The SPMTs then drove the old bridge sections to the area where they were finally taken away for scrapping. In the second phase, beginning August, the two new bridge sections will be lifted into position. The new bridges weigh 1375T (Chartres bridge) and 949T (Gallardon bridge) and are preassembled on the other side of the road. These bridge sections will be transported closer to the SGC-90 by SPMTs. For more information, see here: https://www.sarens.com/about/news/sar...
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: