JP SETU pul Patna | बदलता बिहार
Автор: Nitish Prakash Surya
Загружено: 2017-06-18
Просмотров: 100366
Описание:
Bihar is Developing at a very rapid rate, but is development of Infrastructure alone is sufficient. The 4.556 km long new bridge over ganga is now opened from both side. Its rail as well as road link is opened for public. this is matter of great pride for all patnaites and to all Bihari as well as for every indian.
Subscribe our channel from here -
The Random Lesson
/ @surya__sir
Everything ABOUT CIVIL Engineering - / @acecivil
=====================================
facebook: / therandomlesson
Website: http://www.therandomlesson.com/
instagram- nitish_prakash_surya
twitter: / nitishprakashnp
Follow Me On My Personal Facebook Page -
/ nitish.prakash.7
=====================================
LIKE COMMENT SUBSCRIBE
This bridge is so huge that u really need to see this with your eyes.
being a civil engineer i admire this whole project.
actually it is a matter of pride for me that i worked in the construction of this Bridge.
The importance of the 4.56 Km long Digha-Sonepur bridge could be gauged from the fact that it would work as an alternative to the existing Gandhi Setu, the link between Patna and north Bihar.
The Gandhi Setu is in a dilapidated condition and its restructuring work will take about 42 months. The work is yet to start.
Prime Minister Narendra Modi had inaugurated the rail section of the bridge on March 12, 2016.
do check these links
===================================================
twitter: / nitishprakashnp
facebook: / nitish.prakash.7
linkdin: / nitish-prakash-743ab0140
my website: https://nitishprakashnpn.wixsite.com/...
=====================================================
#JPSETUPATNA #jpsetu
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: