Construction scheduling of Karavanke tunnel
Автор: Autodesk Transportation Infrastructure
Загружено: 2017-10-18
Просмотров: 1772
Описание:
Owner: sfinag and DARS (Motorway Companies in the Republic of Austria and Slovenia)
Elea iC was hired to support the design of the second tube for the Karavanke tunnel project, an 8.0 km long, single tube, bidirectional motorway tunnel connecting Austria and Slovenia. The team is piloting BIM on this complex project where App. 190 partial models are being exchanged across disciplines and coordinated in 5 Coordination models using IFC and BCF standard for interdisciplinary collaboration. In this video you see scheduling of the tunnel construction with Navisworks.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: