RAW POV | 38M Putzmeister Pouring a Hillside Footer w/ 25ft Tip — Maxed Out 1:1 Setup
Автор: We Work For a Living
Загружено: 2026-01-07
Просмотров: 507
Описание:
Pouring a footer on the side of a hill with a 38M Putzmeister, running a 25ft tip hose, and pushing the setup to the limit. This job required maxing out the 1:1 ratio and using extra dunnage to raise the front end of the pump just to make it work safely.
This is full operator POV, showing real-world decision-making, setup strategy, and controlled placement on a steep slope where stability and boom geometry matter.
In this video:
✔️ 38M Putzmeister hillside setup
✔️ Footer pour on sloped terrain
✔️ 25ft tip hose workflow
✔️ Maxed 1:1 outrigger ratio
✔️ Extra dunnage for front-end lift
✔️ Real operator judgment and execution
If you like technical pumping, challenging setups, and seeing how operators solve problems in the field, this one’s worth watching.
🎥 Shot on GoPro HERO13
👷♂️ Operator POV | 38M Putzmeister | Hillside Footer Pour
🔔 Like & subscribe for more RAW concrete pumping POV
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: