Navi Mumbai Metro is an urban Mass Rapid Transit System (MRTS) with 1 line being built to serve the area of Navi Mumbai (Belapur, Kharghar, Taloja & more) in Maharashtra by City and Industrial Development Corporation (CIDCO).
Construction work for Navi Mumbai Metro’s 11.10 km Phase 1 line from CBD Belapur to Pendhar with 11 stations started in November 2011 and is expected to be completed by 2023 owing to delays in receiving key approvals, poor project management by the operator and contractors involved, and a lack of general interest by the state government.
Navi Mumbai Metro is expected to be completed and opened in June 2023 , beyond its current 2022-end deadline.
Although the Maharashtra government has released a 106.40 km master plan comprising of 6 lines, it is unlikely that it will be followed. New metro lines are expected to be announced in the coming years influenced by the construction of the Navi Mumbai Airport in Palvel – Ulwe.
In June 2019, Navi Mumbai’s City and Industrial Development Corporation (CIDCO) had given an in-principle approval to entrust DMRC with implementing the city’s Line-2 and Line-3 after which DMRC began locally recruiting in October for various posts.
System Specifications
Top Speed: 80 kmph
Average Speed: 34 kmph
Track Gauge: Standard Gauge – 1435 mm
Electrification: 25 kV, 50 Hz AC OHE
Signalling: Cab Signalling/Distance to Go
Key Figures
Operational: 0 km | Under Construction: 11.10 km | Proposed: 95.30 km
Estimated Daily Ridership: 1 lakh (2027)
Rolling Stock: 24 coaches (8 train-sets x 3) supplied by CRRC
Navi Mumbai Metro Routes (Under Construction)
Line-1: CBD Belapur – Pendhar
Length: 11.10 km
Estimated Cost: Rs. 3063.63 cr
Type: Elevated
Depot: Taloja
Number of Stations: 11
Station Names: CBD Belapur, Sector 7, CIDCO Science Park, Utsav Chowk (Khargar), Sector 11, Sector 14, Central Park, Pethpada, Sector 34, Panchanand, Pendhar
Navi Mumbai Metro Future Network
Line-2: Taloje MIDC – Khandeshwar
Note: This line is an extension of Line-1
Estimated Cost: Rs. 2820.20 cr
Length: 7.12 km
Stations: 6
Type: Elevated
Line-3: Taloje MIDC – Pendhar
Note: This line is an extension of Line-1
Estimated Cost: Rs. 1750.14 cr
Length: 3.87 km
Stations: 3
Type: Elevated
Line-4: Khandeshwar – Navi Mumbai International Airport (NMIA)
Note: This line is an extension of Line-1
Estimated Cost: Rs. 1270.17 cr
Length: 4.17 km
Type: Elevated & Underground
instagram link : / sum_war_dia. .
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: