Rigging is the equipment, and the action of designing and installing the equipment, in the preparation to move objects. A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide or lift objects such as with a crane, hoist or block and tackle.
scope of work:
PULL-OUT, TRANSFER, UNLOADING, LIFTING, HAULING IN & POSITIONING OF 1 LOT PRODUCTION MACHINE FROM PTC CARMONA
TO SILANG DAICHI
MACHINE WEIGHT : 200kg each
EQUIPMENT :
1 unit 25tons rough terrain crane by tiken
1 unit 13tons Forklift by ROTTECC
3 units 10wheeler wingvan
1 unit open truck
BUSINESS INQUIRY
[email protected]
09174232077
(046) 889 4699
fb page: RRG MOVING SERVICES / RRG PROJECT CARGO INC.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: