TS Patriot State - Shift, State Pier to Training Ship Berth
Автор: Evan B
Загружено: 2025-12-11
Просмотров: 45
Описание:
The USTS Patriot State arrived at Massachusetts Maritime Academy on 22 February 2025 to complete Sea Term 2025. Due to high winds, the ship was required to make fast to the State Pier at the west end of the Cape Cod Canal and await more favorable conditions. Conditions suitable for the shift from the Canal to the training ship's ordinary berth presented themselves two days later, in the early morning of 24 February.
Due to the strong current and potential draft constraints, moves in or out of the training ship berth must be completed at high-water slack. Due to the challenges of predicting hydraulic current velocity in the Cape Cod Canal, all preparations must be complete some time prior to the anticipated slack water, ensuring no time is lost when the current pauses at high water.
The underway portion of the shift is played in real time, with the periods before and after the transit sped up into a time lapse.
The navigation app used for the inset is SEAiq Pilot VPP, used with NOAA ENCs freely available from nauticalcharts.noaa.gov
00:00 Title
00:24 The players
00:32 Hurry up and wait (30x speed)
00:38 Taking in additional lines
01:19 Taking in lines
01:37 Real-time resumes
02:06 Last Line
03:15 Underway
03:50 Making way
10:30 Turn complete
11:00 Coming ahead
13:20 First Line
13:30 Continuing ahead
22:18 In position
27:45 Working lines (30x speed)
28:08 Tugs back off
28:44 Gangway landed
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: