Contents
1. Introduction
2. Project Goals
3. Methodology
4. Comparison and Analysis
5. Conclusion
Introduction
Transmission line length
Geographical Condition
ROW
Material Cost
Designing & Engineering
Project Goals and Scope
Enhanced Power Capacity
Reliability improvement
Grid Expansion
Voltage Regulation
Methodology
Project Data Collection
Engineering and Design
BOQ Preparation
Loading Cost
(Price esclation,contigency,ROW,Noc Cost,Supervision cost)
Comparison and Analysis
ACSR Zebra conductor (54+7/3.18MM)
Current Carrying capacity at 65oC=201.26amp
Load Capacity=200MVA
Weight=1.620Kg/m
Per kM cost for 132kV DC line (Approx 98lac/kM)
Per kM cost for 132kV SC line (Approx 80 lac/kM)
Per kM cost for 220kV DC line (Approx 112lac/kM
ACSR PANTHER conductor30+7/3MM
Current Carrying capacity at 65oC=179.89Amp
Load Capacity=75MVA
#YouTubeVideoTags #TransmissionLineProject #EngineeringAnalysis #PowerGrids #VoltageRegulation #ProjectMethodology
#EngineeringProject #PowerInfrastructure #TransmissionLineDesign #InfrastructureAnalysis
Connect with me
=============================
Blog Facebook Instagram You tube Twitter
Twitter: / yadavv070
Instagram:https://instagram.com/vcool_t?igshid=...
youtube- @solutrix6067
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: