#8 From Structure to Finishes: House Renovation Progress
Автор: O2G com Nina Chagas
Загружено: 2026-02-03
Просмотров: 42
Описание:
Welcome to another episode of Old to Gold — a real house renovation journey from start to finish.
In Episode 8, the renovation officially reaches the finishing stage, with multiple tasks happening at the same time to keep the project on track and moving forward.
With the structural work completed and drywall already installed, we continue with key renovation steps, including:
🔨 Masonry wall plastering for surface leveling and durability
🧱 Drywall joint finishing for smooth walls and ceilings
🚿 Bathroom tiling installation in the second bathroom
🪜 Wooden staircase restoration and structural reinforcement
In this episode, Nina explains the technical differences between tiling over drywall and tiling over masonry, especially in wet areas like bathrooms. She highlights essential construction practices such as moisture-resistant boards, waterproof sealing, flexible adhesive, and proper tile alignment.
You’ll also see the restoration of the wooden staircase, which is supported by masonry walls on both sides. The process includes structural inspection, reinforcement of wooden steps, and rebuilding the risers to improve safety, comfort, and long-term performance.
Each renovation stage is carefully planned and executed — because turning an old house into a safe, comfortable, and durable home requires technical knowledge, attention to detail, and respect for the process.
👉 Like the video
👉 Leave a comment and share your thoughts
👉 Subscribe to the channel and turn on notifications
Follow O2G on social media:
📸 Instagram (English) — www.instagram.com/oldtogoldofficial
📸 Instagram (Portuguese) — www.instagram.com/oldtogoldoficial
🎵 TikTok — www.tiktok.com/@oldtogoldofficial
📺 YouTube — / @oldtogoldofficial
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: