ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

fdr road construction | Full Depth Reclamation process | FDR Road

Автор: Civil Pitamah

Загружено: 2022-07-30

Просмотров: 8158

Описание: Road Construction Process | road construction video | Full Depth Reclamation process | FDR Road | FDR |Road Construction Step by step | Road Construction Process Step by step | Road Construction video Step by step

नयी तकनीक से सड़कों का निर्माण | Full Depth Reclamation Road Construction | FDR Roads | Road Stabilization | New Technology Roads | UPRRDA | Road Construction

In this video you will learn about how to Cold-inplace recycling of pavements. Full Depth Reclamation ( Cement stabilization with additive) Process | FDR Equipment Train | New Technology Roads | Cement Treated Base | Cement Treated Subbase

एफ.डी.आर. यानि फुल डेप्थ रिक्लेमेशन तकनीक सड़क निर्माण के क्षेत्र में एक तरह का क्रांतिकारी कदम है। इसमें लागत और समय की भी बचत होती है। साथ ही साथ ये सड़के बहुत मजबूत होती हैं। चित्रकूट उत्तर प्रदेश का पहला जनपद है जहां से एफ.डी.आर. तकनीक पर सड़क निर्माण की शुरूआत हुई है। इस नई तकनीक में रिसाईकिलर, ऑटोमैटिक सीमेन्ट स्प्रेडर, 20टन पैट फुट रोलर, टैण्डम रोलर, मोटर ग्रेडर और पीटीआर रोलर जैसी विशेष प्रकार की मशीनों का उपयोग किया जा रहा है। मार्गों के निर्माण की गुणवत्ता की जांच साइट पर ही करने के लिए एक बेहद आधुनिक लैब भी स्थापित की गई है।

Our previous Videos link For Highway Engineering is given below please checkout:

Rise & Fall Method Level Calculation in Excel | Surveying
   • Rise & Fall Method Level Calculation in Ex...  

Counter Flow Asphalt Drum Mix Plant complete procedure | Asphalt Mix Production
   • Counter Flow Asphalt Drum Mix Plant comple...  

Calculation of Road Levels in MS Excel | Level Calculation in MS Excel
   • Calculation of Road Levels in MS Excel | L...  

Height of Instrument in Levelling | Theory & Concept | Surveying
   • Height of Instrument in Levelling | Theory...  

Pavement Design Part-1 | Traffic Survey Calculation As per IRC SP:72-2015 Code
   • Pavement Design Part-1 | Traffic Survey  C...  

Temperature of Bituminous Mixes | Use of Remixing Transfer Vehicle | Highway Engineering
   • Temperature of Bituminous Mixes | Use of R...  

what is toe width | how to calculate road toe width | formation width of road
   • what is toe width | how to calculate road ...  

Formation Level in subgrade Layer & Its Determination for Earthwork calculation
   • Formation Level in subgrade Layer & Its De...  

Difference between WBM and WMM | Water Bound Macadam | Wet Mix Macadam
   • Difference between WBM and WMM | Water Bou...  

There are some videos related to Highway Engineering-------Links are given below

What is Toe Width, Formation Width, Carriageway and Shoulders in road | How to read Road Drawings
   • What is Toe Width, Formation Width, Carria...  

Gradients in Road | Type of Gradient | Purpose of Gradient
   • Gradients in Road | Type of Gradient | Pur...  

What is Prime coat, Tack coat and Seal coat in Pavement
   • What is Prime coat, Tack coat and Seal coa...  

Bitumen Types , uses & Properties | Bitumen emulsion | Cutback Bitumen
   • Bitumen Types , uses & Properties | Bitume...  

How to calculate Camber for Road surface | How to check Camber for road
   • How to calculate Camber for Road surface |...  

Water required for compaction | Calculation of Soil quantity from borrow area
   • Water required for compaction | Calculatio...  

Type of Pavements | Pavement Layers | Load Transfer Mechanism | Differences in Pavements
   • Type of Pavements | Pavement Layers | Load...  

Tender Process |Online Bid Submission for Tender | E Procurement Tender Process
   • Tender Process |Online Bid Submission for ...  

Drawings used in Highway Engineering | Drawings Attached in Estimate of Roads | Road Estimation
   • Drawings used in Highway Engineering | Dra...  

What is T Junction & Chak Road | Role in Estimation | Quantity Calculation | Highway Engineering
   • What is T  Junction & Chak Road | Role in ...  

What is Open Graded Premix Carpet | OGPC | Bituminous Surfacing | Highway Engineering | Quantity
   • What is Open Graded Premix Carpet | OGPC |...  

What is Kerb & Channel Drain | Traffik & Monoblock Drain | Estimation of K.C. Drain
   • What is Kerb & Channel Drain | Traffik & M...  

How to calculate earthwork for roads| Calculate earthwork in filling and cutting | Highway Engineering
   • Earthwork in road construction  | Road Est...  

Also follow our Social media network for more information
  / civilpitamaha  
  / 34332.  .
  / civilpitamah  
  / admin  .
https://t.me/Civilpitamah
https://www.civilpitamah.blogspot.com
Our Website is
https://www.civilpitamah.com

------------------------------------------------------------------------------------------------------------------------------------------------------
Related Tags
Full depth reclamation cost
full depth reclamation in india
full depth reclamation machine price in india
full depth reclamation machine
fdr technology roads
new road technology in india
modern technology road construction machines
modern technology road
road construction machine
road construction technology
road construction video
road construction civil engineering
road construction time lapse
road construction world record
road construction business

#civilengineering #Highwayengineering #Civilengineer #Civilpitamah #Roadconstruction #Fulldepthreclamation #fdr #fulldepthreclamationprocess

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
fdr road construction | Full Depth Reclamation process | FDR Road

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Full Depth Reclamation Process | FDR | FDR road construction| Road construction

Full Depth Reclamation Process | FDR | FDR road construction| Road construction

Process Video: FDR Roads with Zydex Technologies

Process Video: FDR Roads with Zydex Technologies

FDR is a cost-effective way & eco-friendly way to connect unconnected rural habitats | #PMGSY

FDR is a cost-effective way & eco-friendly way to connect unconnected rural habitats | #PMGSY

BEST Operation Skilled Using KOMATSU D31P Dozer and 6-Wheel Dump Trucks Filling Flooded Land

BEST Operation Skilled Using KOMATSU D31P Dozer and 6-Wheel Dump Trucks Filling Flooded Land

Full Depth Reclamation or Full Depth Recycling of pavements - Applications, Design and Lomitations.

Full Depth Reclamation or Full Depth Recycling of pavements - Applications, Design and Lomitations.

Гениальные строители другого уровня 🏗️🔥

Гениальные строители другого уровня 🏗️🔥

Water Bound Macadam | WBM | Volumetric Analysis of WBM Material

Water Bound Macadam | WBM | Volumetric Analysis of WBM Material

How Germany’s Smart Engineers Made a Massive Unlimited-Speed Highway Leaving Americans in Awe

How Germany’s Smart Engineers Made a Massive Unlimited-Speed Highway Leaving Americans in Awe

Excavation, Trimming & Levelling of Embankment Subgrade for Road Pavement Construction

Excavation, Trimming & Levelling of Embankment Subgrade for Road Pavement Construction

Start Opening New Project!!Bulldozer Mitsubishi BD2A pushing Soil into Dirty water&5Ton Trucks​.

Start Opening New Project!!Bulldozer Mitsubishi BD2A pushing Soil into Dirty water&5Ton Trucks​.

Full Depth Reclamation Process | FDR Road Sampling Procedure

Full Depth Reclamation Process | FDR Road Sampling Procedure

WOW!! Amazingly Unexpected Truck Dumping Gone Wrong Skills Recovery By Bulldozer Komatsu

WOW!! Amazingly Unexpected Truck Dumping Gone Wrong Skills Recovery By Bulldozer Komatsu

Почему Ядерная война уже началась (А вы не заметили)

Почему Ядерная война уже началась (А вы не заметили)

Cold In-Place Recycling (CIPR) Technology

Cold In-Place Recycling (CIPR) Technology

Amazing Project With Good Equipment SHANTUI Dozer Pushes Clean The Old Road And Cleared The Forest

Amazing Project With Good Equipment SHANTUI Dozer Pushes Clean The Old Road And Cleared The Forest

German Technology Road Construction | An Advanced Roadway | Experimentally Used at Poranki

German Technology Road Construction | An Advanced Roadway | Experimentally Used at Poranki

The Powerful Caterpillar 966E vs 966E Tumptruck Overloaded. Heavy machinery Loader

The Powerful Caterpillar 966E vs 966E Tumptruck Overloaded. Heavy machinery Loader

Rigid Pavement & it's Layers I Difference b/w Rigid & Flexible Pavement I #civilengineering #highway

Rigid Pavement & it's Layers I Difference b/w Rigid & Flexible Pavement I #civilengineering #highway

Start Opening Amazing Project!! Landfill Delete Dirty Flood By Skills Dozer Pushing Stone Into Water

Start Opening Amazing Project!! Landfill Delete Dirty Flood By Skills Dozer Pushing Stone Into Water

How roads are build PWD FDR (Full Depth Reclamation Technology)

How roads are build PWD FDR (Full Depth Reclamation Technology)

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]