WIND OSPREY . Wind Turbine Installation Vessel
Автор: MadsenFromEsbjerg
Загружено: 2026-05-03
Просмотров: 85
Описание:
WIND OSPREY is in the process of building the Wind Farm East Anglia THREE is a 1.4 GW offshore wind farm . On this trip it has 3 complete offshore wind turbines with it.
PRINCIPAL DIMENSIONS
Length over all 160.90 m
Length between perpendiculars 155.60 m
Breadth, moulded 49.00 m
Depth to main deck 10.40 m
Draught, design 5.50 m
Draught, max. 6.00 m
Payload, jacking up to 11,000 t
Max. Speed 13.0 kts.
MAIN CRANE
Main Hook SWL 1,600 t @ 40 m
1,200 t @ 50 m
Whip Hook SWL 425 t
Max. operating wind speed 16 m/s (1 minute mean, @ 10 m)
Utility Hoist SWL 15 t (man-riding).
OPERATING CONDITIONS FOR JACKING
Service Restrictions when Jacking:
Wind Speed 20 m/s
Significant Wave Height 2.5 m
Leg Length 105 m