If the UK Power Grid Failed, Who Goes Dark First and Who Stays Dark Longest?
Автор: WorstPlausible
Загружено: 2026-11-12
Просмотров: 227
Описание:
If the UK power grid failed, which places would go dark first? We ranked all 14 of Britain's power network areas on their own record.
Britain's grid has a rulebook for failing: a table in the Grid Code that sets how much power is switched off, where, and in what order. This video starts with that table and the afternoon in 2019 when it was used, then counts down from fourteen to one through the local networks that carry power to your door, from fastest to slowest at getting the lights back. One question is left for the list: whose power would come back last?
Great Britain has never lost power across the whole country, and the National Risk Register calls the chance low. On 9 August 2019 a lightning strike set off a chain of failures and the grid cut off more than a million customers; everyone was back within 45 minutes.
CHAPTERS
0:00 The afternoon a table chose
0:53 The way down
2:03 Who keeps the lights
3:13 The list nobody publishes
4:55 Fourteen to six
6:21 London
7:18 Five to two
8:45 Inside your area
9:53 Number one
HOW TO READ THIS VIDEO
DOCUMENTED: what the Grid Code, Ofgem, NESO and the islands' own operators say, quoted or reported as written.
MODELLED: our ranking of the 14 areas. The inputs are Ofgem's published figures; the ranking is our own calculation.
A total shutdown of the grid has never happened in Great Britain. This video is not a forecast.
HOW THE RANKING WAS MADE (MODELLED)
Ofgem's customer minutes lost, planned and unplanned, for all 14 licence areas, averaged over the eleven years 2014/15 to 2024/25 and ranked from shortest to longest by our own calculation. It is a record of ordinary years, not NESO's restart order: NESO has not published which areas would come back first.
KEY SOURCES (every number, date and quote, with pages, is in the pinned comment)
National Grid ESO, Technical Report on 9 August 2019: https://www.ofgem.gov.uk/sites/defaul...
Ofgem, 9 August 2019 power outage report: https://www.ofgem.gov.uk/system/files...
NESO, Grid Code OC6 Demand Control: https://www.neso.energy/document/2991...
NESO, System Defence Plan, Table CC.A.5.5.1a: https://www.neso.energy/document/2871...
National Risk Register 2026, pp.118-119: https://assets.publishing.service.gov...
NESO, Restoration Assurance Framework 2025/26: https://www.neso.energy/document/3755...
NESO, FOI/25/169: https://www.neso.energy/document/3751...
Ofgem RIIO-ED1 and RIIO-2 ED datafiles (customer minutes lost): links in the pinned comment
CREDITS
Photographs: 47 from Wikimedia Commons (CC BY 2.0, CC BY-SA 2.0, 3.0 and 4.0), cropped, graded and some captioned by us. Every photographer, title, licence and link is in the "PICTURE CREDITS" comment below. Tower Bridge: Dietmar Rabich / Wikimedia Commons / “London, Tower Bridge -- 2016 -- 4787” / CC BY-SA 4.0. King's Cross: Photo by DAVID ILIFF. License: https://creativecommons.org/licenses/...
Video clips from Pixabay (Pixabay Content License; cropped and graded): Kaffeesüchtig (91282, 318540), FindingFootage (2151), jevtajevtic7 (175213), Engin_Akyurt (192066). Each is at pixabay.com/videos/id- followed by its number.
Maps: NASA Earth Observatory Black Marble night lights (VIIRS; public domain), via NASA GIBS, edited by us: areas are darkened or lit to picture the ranking, and text is added. They are not NASA images of a real blackout. Area boundaries: NESO, GIS Boundaries for GB DNO Licence Areas (3 May 2024), NESO Open Data Licence. Supported by National Energy SO Open Data.
Storm Arwen from space: NASA Worldview, 27 November 2021, public domain.
Document pages shown are short extracts, credited on screen. National Risk Register and BEIS pages: contains public sector information licensed under the Open Government Licence v3.0: https://www.nationalarchives.gov.uk/d...
Music: an original bed synthesised in code; no third-party music or sound effects.
The narration is an AI voice. The film contains no AI-made pictures. The thumbnails are AI-made scenes with the headline added in code, except the code-drawn map.
Worst Plausible (@worstplausible): extreme scenarios, run on the evidence.
#UKPowerGrid #PowerOutage #Infrastructure
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: