L1🔴 "Propatria-Palo Verde" | Metro Line Tour (2024) Caracas Metro
Автор: Venezuela Transport Info
Загружено: 2024-12-12
Просмотров: 25734
Описание:
📸Recorded during the months of November and December 2024.
Caracas Metro Line 1 is the subway service that operates between the Propatria and Palo Verde stations. It was the first line of the system to be built. It began operations on January 2, 1983 during the government of President Luis Herrera Campins and its last extension was inaugurated on November 19, 1989. It currently has 22 stations and is 20.4 kilometers long. It is the line with the most stations in the entire Caracas subway system. In kilometers it is only surpassed by Line 2, which accumulates 23.1 km.
Its current rolling stock consists of CAF S60000.
Previously, Alstom Atlantique S1 and S2 were used, which currently circulate on Line 2.
Créditos a @SneyTransport por la foto para la miniatura del vídeo.
Grupo de Telegram:
https://t.me/VenezuelaTransportForum
#metro #tren #caf #alstom #railfan #railway #caracas #metrodecaracas #venezuela #poramoralmetro #fotografo #subway
00:00 - Intro
00:10 - Terminal Propatria
02:51 - Pérez Bonalde
06:12 - Plaza Sucre
08:57 - Gato Negro
12:03 - Agua Salud
16:33 - Caño amarillo
20:03 - Capitolio (Transferencia a L2)
24:33 - La Hoyada
28:29 - Parque Carabobo
31:18 - Bellas Artes
34:26 - Colegio de ingenieros
38:59 - Plaza Venezuela (Transferencia a L2 y L3)
46:46 - Sabana grande
51:42 - Chacaito
56:53 - Chacao
1:00:38 - Altamira
1:06:03 - Miranda
1:10:30 - Los Dos Caminos
1:14:07 - Los Cortijos
1:17:07 - La California
1:20:03 - Petare (Transferencia a CT)
1:26:24 - Terminal Palo Verde
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: