Telecom Tower Foundation Reinforcement Work | Step-by-Step Process Before Concreting
Автор: ABM
Загружено: 2026-02-02
Просмотров: 51
Описание:
In this video, we show the complete reinforcement process of a telecom tower foundation before concreting.
The video starts with foundation excavation and base PCC marking, followed by proper reinforcement bar placement as per drawing.
You will see how bottom base block reinforcement is laid accurately with correct spacing and cover blocks.
Next, column starter bars are erected in position and aligned properly.
After that, bar binding work is carried out carefully using binding wire to ensure strong connections.
In the final stage, Z-shape reinforcement bars are bent and connected between the upper column base block and lower base block, exactly according to the structural drawing.
This connection ensures that the upper and lower blocks act as one solid structure, providing maximum strength and stability to the foundation.
⚠️ Note:
This video shows the reinforcement stage only.
No concrete work has been done yet, making it ideal for understanding the structure clearly before concreting.
This process is critical for: ✔ Telecom tower safety
✔ Load transfer
✔ Long-term durability
📌 Must-watch for site engineers, civil students, supervisors, and construction professionals.
#TelecomTower #abminfocom #facts #compressivestrength #tranding #informative #knowledge #civilengineering #viralvideo #telecomtower #viral
#TowerFoundation
#ReinforcementWork
#FoundationWork
#CivilEngineering
#ConstructionSite
#RebarWork
#ZBarReinforcement
#BeforeConcreting
#StructuralEngineering
#SiteWork
#EngineeringLife
#CivilEngineer
#ConstructionReels
#IndianConstruction
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: