A14 Cambridge to Huntingdon Improvement Scheme
Автор: Tensar, a division of CMC
Загружено: 2021-04-30
Просмотров: 1079
Описание:
Tensar’s involvement in the new A14 Cambridge to Huntingdon Improvement Scheme. Delivering robust and cost effective reinforced soil structures and flexible pavements following the removal of the Huntingdon viaduct.
This video showcases the TensarTech GreenSlope and TensarTechTW3 systems.
For more information on the project, read our brochure:
https://bit.ly/3e3Pmp6
Other videos related to this topic
1. How to Install Tensar TriAx Geogrids on Roadway Projects
• How to Install Tensar TriAx Geogrids on Ro...
2. TensarTech TW3 Wall Aerial footage at Tinsley Link, Sheffield, UK
• TensarTech TW3 Wall Aerial footage at Tins...
3. FARRRS Aerial footage of TensarTech TW1 Wall System
• FARRRS Aerial footage of TensarTech TW1 Wa...
Our Web & Social channels are as follows -
1. Website : https://www.tensar.co.uk/
2. Email: [email protected]
3. LinkedIn: / tensar-international-limited
#newa14 #huntingdonviaduct #tensargeogrids #geogrid
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: