ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

Before & After | Glenn Drive Railroad Crossing In Folsom, California On SACRT Gold Line

Автор: MobileRailSpotterRxR

Загружено: 2024-12-29

Просмотров: 15348

Описание: In this video you will see the changes at the Glenn Dr railroad crossing on the Sacramento Regional Transit light rail system's Gold Line in Folsom, CA. Several unmarked changes also like the sidewalks at the crossing cut, Folsom Blvd crosswalk cut, Crossing has two new L&W Crossing beacons too that I forgot to include in the equipment info in screen, new wayside aspect signals around station, Glenn Dr bike path crosswalk moved over closer to camera position and median 3 small trees now 2 small trees 1 removed for the crosswalk. Crossing signals aren't in original spots as their previous counterparts to fit the 2 track setup, The station new platform, yellow flasher isn't in the same location as the old one as new one was installed farther back or in front of old spot, note the crossing activation timing and train arrival was changed in the new crossing in the yellow flasher comparison since I got both before and after trains coming from the same direction, signs, and more. Decided i'll bring this video to you before the year ends.

----------------------------

Note the Gold Line at Iron Point - Glenn/Robert G. Holderness - Historic Folsom is still shut down with a unknown reopening in service date. The trains I caught to film the new Glenn Dr were test trains which are not in revenue service here. This section of the Gold Line was shut down Jan 2, 2024 for construction thatbwas originally to be complete by late July 2024 - Early Aug 2024 but ran it dozems upon dozens of different kinds of problems that slowed construction heavily and didn't get done till late Nov/early Dec 2024. Testing started in late Nov 2024 for a feen weeks after starting and operator trainer test trains started mid Dec 2024 for 3 days only.

----------------------------

Timestamps
0:00 Glenn Dr Crossing Before & After Compare
3:18 Yellow Flasher Before, During, & After Compare
7:16 Comparing Single To Double Track At Glenn Dr

Camera's
Sony Handycam FDR-AX53
Sony FX30 Cinema Line
Sony Cybershot RX10 IV
Panasonic HC X2000
Samsung Galaxy S24 Ultra

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
Before & After | Glenn Drive Railroad Crossing In Folsom, California On SACRT Gold Line

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Nash Road Railroad Crossing Replacement

Nash Road Railroad Crossing Replacement

Long Gate Arm Barriers At Railroad Crossings

Long Gate Arm Barriers At Railroad Crossings

Sacramento's Light Rail: Explained (Part 1)

Sacramento's Light Rail: Explained (Part 1)

*New Xing Beacons & Lights Fixed* Natoma St. Railroad Crossing | SacRT Light Rail, Folsom CA

*New Xing Beacons & Lights Fixed* Natoma St. Railroad Crossing | SacRT Light Rail, Folsom CA

*Tramway Square!* Glenferrie Road Kooyong/Toorak - Metro Level Crossing

*Tramway Square!* Glenferrie Road Kooyong/Toorak - Metro Level Crossing

История Московского Метро

История Московского Метро

Yellow Flasher Advance Warning Signals At Railroad Crossings

Yellow Flasher Advance Warning Signals At Railroad Crossings

UP 1017 Florin Flyer Local, SacRT Light Rail |one Shaft Ln. Railroad Crossing, Rancho Cordova CA

UP 1017 Florin Flyer Local, SacRT Light Rail |one Shaft Ln. Railroad Crossing, Rancho Cordova CA

*Dangerously Early Raise ,Triple Emergency Sequence, Cancelled Closure* Barmouth South LC, Gwynedd

*Dangerously Early Raise ,Triple Emergency Sequence, Cancelled Closure* Barmouth South LC, Gwynedd

Repairing a broken barrier at Newhaven Level Crossing

Repairing a broken barrier at Newhaven Level Crossing

The Railroad Crossings of San Diego, CA

The Railroad Crossings of San Diego, CA

All the Level Crossings on the Kyle of Lochalsh Line

All the Level Crossings on the Kyle of Lochalsh Line

UP 1386 Florin Flyer Local, SacRT Light Rail | Jackson Rd. Railroad Crossing, Sacramento Ca

UP 1386 Florin Flyer Local, SacRT Light Rail | Jackson Rd. Railroad Crossing, Sacramento Ca

Trimet 1/10/2026

Trimet 1/10/2026

Поезда метро проезжают железнодорожный переезд на улице Стюарта

Поезда метро проезжают железнодорожный переезд на улице Стюарта

VTA Light Rail Green Line Ride (Winchester - Old Ironsides) [CAB VIEW]

VTA Light Rail Green Line Ride (Winchester - Old Ironsides) [CAB VIEW]

2025 Railroad Crossing Compilation

2025 Railroad Crossing Compilation

【電車 新幹線】踏切動画 65【鉄道】JR東日本 秋田新幹線 田沢湖線 こまち The Shinkansen

【電車 新幹線】踏切動画 65【鉄道】JR東日本 秋田新幹線 田沢湖線 こまち The Shinkansen

ASMR Full Restoration of British Rail Pullman Car No.79 (1928) from Abandoned to New

ASMR Full Restoration of British Rail Pullman Car No.79 (1928) from Abandoned to New

Obscure Transit: SacRT Light Rail

Obscure Transit: SacRT Light Rail

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]