Global Group Warrington Test Single and Double PB to Single Side of Wall
Автор: Global HSE Solutions Ltd.
Загружено: 2019-08-06
Просмотров: 451
Описание:
Indicative test to show wall failure to 1 x 12.5mm and 2 x 12.5mm when installed single side only on 70mm track.
None - standard construction not supported by manufacturers test and design details.
Build represents common issues/latent defects typically on corridor wall lines, incomplete wall lines above ceilings, spandrel panels in roof spaces, bathroom to service riser walls. In most cases these walls must achieve 30mins or 60mins.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: