Routine Construction
Welcome to Routine Construction 🏗️🎓
This channel is your go-to hub for everything related to Civil Engineering, Construction, and Surveying. Our mission is to make construction knowledge simple, practical, and useful for students, engineers, and professionals worldwide.
On this channel, you’ll find:
✔️ Civil Engineering Basics & Advanced Tutorials
✔️ Building Construction Step-by-Step Guides
✔️ Surveying & Leveling with Total Station, GPS & Modern Tools
✔️ Quantity Surveying, Estimation & Costing
✔️ Practical Site Work & Field Training
Whether you’re a civil engineering student, a site engineer, or someone passionate about modern construction technology, Routine Construction brings you knowledge, skills, and real-life insights to help you grow in your career.
🔔 Don’t forget to Subscribe to Routine Construction and be part of our community of engineers and builders shaping the future!
#RoutineConstruction #CivilEngineering #Construction #Surveying #QuantitySurveying #AutoCAD
Slope of drainage pipe or sewer line| Excavation levels for sewer line| Drainage line excavation
How to calculate Irregular land Area | How to find Area of triangle | Area of Triangle
Rise and Fall Method in Levelling | Calculation of Reduced Level by Rise and Fall Method |
Height of Instrument Method | Determination of Reduced Levels | Height of instrument in Levelling
How to calculate drainage Slope| How to calculate sewer line Slope| Slope Calculations|
How to create temporary benchmark||How to measure RL by dumpy level ||TBM||Auto level|
Earthwork Calculations for Road Works| How to calculate Earthwork Quantity of a Road| Road Earthwork
How to Calculate Dumpy Level Reading| BM Shifting With Auto Level| Create a new Benchmark
How to take Levels in Road Construction| Unsymmetrical Vertical Curve| Vertical Curve| Highway
How to Calculate Unsymmetrical Vertical Curve| Vertical Curve Calculation and Formulas| Highways
How to Calculate Vertical Curve| Vertical Curve Calculation and Formulas| Setting Out Vertical Curve
How to Calculate Vertical Curve Elevation| How to Solve Vertical Curve| Vertical Curve Solution
How to Check Gunia of Plot| How to Find the diagonal Length of any Size Plot| Gunia Kaise Nikale|
How to Find Angle Coordinates| Finding Coordinates of Unit Circle| Curve Coordinates Calculations
How to Calculate Slope in Construction| Slope Calculation Formula| Slope Calculation in Percentage
How to Calculate each layer Width of Pavement| How to Calculate Toe Width in Highway| What is Toe
How to Calculate Coordinates from Distance and Bearing Where we have Coordinate of a known Point
How to Calculate Sewerage Line Invert Level & Pipe Length | How to Calculate Invert Levels & Slope
How to Give Excavation Depth From Auto Level Machine| How to Find the Excavation Level by Auto Level
How to Calculate thickness Of Embankment| Earthwork ( Embankment & Subgrade) Embankment| Earthwork
Instructions for Correct Construction and Installation of Ceramic Tile for your Bedroom Floor| Floor
Components of Road Structure| Complete Highway Construction| Road Construction Process| Road Zone
How to Calculate Quantity of Asphalt in Road| Road Construction| Bituminous Road| Road Asphalt|
How to Check Auto Level Error at Site| How to Check Error in Auto Level Machine| Auto Level Error
How to Calculate Volume of Earth Cutting and Filling by using auto level| Road Cutting and Filling
How to Calculate Irregular Triangular Land Area| How to Measure irregular Triangle Area| Land Area
How to Transfer RL by Auto Level| Benchmark(BM) Shifting With Auto Level| How to TBM Shift
Distance Measurement Between 2 Points With Total Station | Horizontal Distance Measure Total Station
How to Bench mark Shifting with auto level| What is Reciprocal Levelling|Double levelling in Survey
How to Calculate of Interior Angles of a Triangles| Interior Angle Measure of a Triangle| Angles