Civil@VRS
Civil@VRS
24CE207 GEOTECHNICAL ENGINEERING Syllabus
Formwork for PT slab
Formwork (Shuttering) for Concreting Shear wall
Jute bags used for concrete curing
3 inch thick concrete band in BRICKWORK
32 mm dia TMT Rebar Fe550D grade
Conceptual mapping of Engineered Landfill Design by B. Kavya Sri
Conceptual mapping of Engineered Landfill Design by A. Maheswari
Solar power irrigation system
Sustainable Solar Park Rural Development
Conceptual mapping of Engineered Landfill Design by BVS Abhiram
Cost Vs. Value
Cup lock formwork system
Prefabricated MS pergola
Rate analysis of 230mm thick first class brickwork
Rate analysis of Plastering by Mr. Akshay
Rate analysis of painting by Mr. Phani Vardhan
Rate analysis of enamel painting to doors by Mr. Meboob
Rate analysis of RCC footing by Mr. Shyam Sundar
Rate analysis of RCC slab by Mr. Venkat Krishna
Rate analysis of Cement Concrete (1:4:8) in foundation bed per 1 cu.m by Mr. Prabhu
Rate analysis of RCC Beam by Mr. Pradeep
Rate analysis of Cement Concrete (1:2:4) Flooring of 2.5 cm thick
Quantity of Earthwork in CANAL for partly in filling & cutting
LEAD & LIFT
Quantity of Earthwork in filling for ROAD formation level crossing cutting to filling
Quantity of Earthwork in filling for ROAD
Estimation of RCC Isolated Sloped Footing
Estimation of RCC Beam
Bar Bending Schedule (BBS)